Business divisions
Soil/Groundwater remediation, Mine reclamation, Technical diagnosis, Waste and water treatment, Marine environment, Production of environmental productsResearch center
Basic and applied research in environment fields, Technology development and transfer, Participation in government-supported projectsTreatment plants
Contaminated soil treatment center – 1st treatment plant in Yangju, 2nd treatment plant in SeosanTitle | Date |
---|---|
(주)에코필 홈페이지가 리뉴얼 개설되었습니다.
|
2017.04.17 |
Title | Date |
---|
Ecophile business performance
Dasan Hyundai OOOO soil remediation (Soil Flushing/ Pumping and Treat)
- Amount of contaminated soil : 2,405㎥(In-Situ)
- Contamination Depth: G.L (-) 6.0 to 12.0 m
- Contaminants : TPH
- Treatment method : Soil Flushing & Pumping and Treat
- Target concentration : TPH 2,000mg/kg-soil
LPP return US ground base water treatment (Camp Nimble)
◆ Groundwater treatment – Pumping & Treat
- Period : 2009.10.06. ~ 2011.12.31.
- Subject: contaminated ground water and civil engineering drainage
- Handling volume: 320㎥ / day
- • Treatment target: TPH <1.5mg / L, Benzene <0.015mg / L, Toluene <1.0mg / L, Ethylbenzene <0.45mg / L, Xylene <0.75mg / L (Based on domestic water)
Location and Contact
3F, 21, Mabang-ro 6-gil, Seocho-gu, Seoul (Jichang Building)
+82-2-3461-5517
+82-2-3461-5518