Groundwater treatment – Pumping & Treat

  • Period : 2009.10.06. ~ 2011.12.31.
  •  Subject: contaminated ground water and civil engineering drainage
  • Handling volume: 320㎥ / day
  • • Treatment target: TPH <1.5mg / L, Benzene <0.015mg / L, Toluene <1.0mg / L, Ethylbenzene <0.45mg / L, Xylene <0.75mg / L   (Based on domestic water)